2025 Latest Test4Engine C-TS470-2412 PDF Dumps and C-TS470-2412 Exam Engine Free Share: https://drive.google.com/open?id=1HSEdgdETawyAbTv2tEKuJFu09Fym7FCT
You will not only get familiar with the SAP Certified Associate - SAP S/4HANA Cloud Private Edition Service (C-TS470-2412) exam environment but also enhance your time management skills which will be quite helpful in the final C-TS470-2412 certification exam. The C-TS470-2412 desktop practice test software will install on your Windows-based computer and laptop. Very easy to install and provide a user-friendly interface to C-TS470-2412 Exam candidates. Whereas the C-TS470-2412 web-based practice test software is concerned, it is a browser-based application that works with all the latest browsers.
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
>> Exam C-TS470-2412 Assessment <<
Do you have registered for the SAP C-TS470-2412 exam and are worried about SAP C-TS470-2412 exam preparation? Try SAP C-TS470-2412 PDF Questions and practice tests which help you prepare the whole course in less duration. The SAP C-TS470-2412 practice test material gives you a clear idea to prepare for the SAP C-TS470-2412 Exam and saves you preparation time. An C-TS470-2412 exam is a time-based exam, and the candidate must be fast enough to solve the problems in a limited time.
NEW QUESTION # 38
Which assignment is required in a cross-plant planning scenario?
Answer: D
Explanation:
In across-plant planning scenario, maintenance activities span multiple plants. The correct answer isB. Let's unpack this.
Cross-Plant Planning Context:
One planning plant oversees maintenance for multiple maintenance plants (where technical objects reside).
Why Several Maintenance Plants to a Planning Plant?
The planning plant is the central hub for scheduling and resource allocation. Maintenance plants (e.g., Plant
0001, Plant 0002) are assigned to it (e.g., Plant 1000) in customizing (SPRO # Enterprise Structure # Assignment # Plant Maintenance). This ensures a single point of control for work orders and plans across plants.
Why Not the Others?
* A:Planner groups are assigned within a plant, not across plants directly.
* C:Multiple planning plants for one maintenance plant is illogical.
* D:Planner groups operate within a planning plant, not across multiple.
Example:
Planning Plant 1000 manages maintenance for Plants 0001 and 0002.
"In cross-plant planning, several maintenance plants are assigned to a planning plant to centralize maintenance scheduling."
NEW QUESTION # 39
To which of the following can you assign maintenance packages? Note: There are 2 correct answers to this question.
Answer: B,C
Explanation:
In SAP S/4HANA Cloud Private Edition, Service,maintenance packagesdefine the intervals or cycles (e.g., every 6 months, 1,000 hours) at which maintenance activities are performed within a maintenance plan. They are assigned to:
* Task list (C):Maintenance packages can be linked to operations in a task list to specify when each operation is due.
* Maintenance strategy (D):A maintenance strategy groups multiple packages (e.g., time-based or performance-based cycles) and is assigned to a maintenance plan, which then applies the packages.
* Service technician (A):Technicians are assigned to operations, not maintenance packages directly.
* Work schedule (B):This is not a standard object in SAP for assigning maintenance packages.
"Maintenance packages are assigned to task lists and maintenance strategies to define the scheduling intervals for maintenance activities in a plan."
NEW QUESTION # 40
What happens when you execute the step "Release for Billing" in an in-house repair process?
Answer: B
Explanation:
In thein-house repair processin SAP S/4HANA Cloud Private Edition, Service, the "Release for Billing" step initiates the billing process for repair activities. The correct answer isC: "The system creates a billing document request for each selected repair confirmation item." Arepair confirmation(e.g., transaction type REPC) records the work done, and when released for billing, the system generates abilling document request (BDR)for each confirmed item that is billable. The BDR is a preliminary document that can later be converted into a billing document(e.g., an invoice) via the billing due list.
* A:Billing due list entries are an outcome of BDRs, not directly created per repair object.
* B:Billing documents are not created immediately; BDRs are created first.
* D:Completion status is separate from billing release.
"Upon executing 'Release for Billing' in an in-house repair process, the system generates a billing document request for each selected repair confirmation item, enabling subsequent invoicing."
NEW QUESTION # 41
After confirming a repair object in an in-house repair, which status is displayed?
Answer: B
Explanation:
In the in-house repair process within SAP S/4HANA Cloud Private Edition, Service (scope item 3XK), the status of a repair object evolves through its lifecycle, managed via a status profile assigned to the repair item category (e.g., REPI). According to the SAP Learning Journey "Planning and Performing In-House Repairs," after a repair object is confirmed via a repair confirmation (transaction type REPC), the status does not immediately transition to "Confirmed" as a final state. Instead, the confirmation indicates that the repair work has been documented, and the object remains in an active processing state, reflected as"In Process".
* In Process: This status signifies that the repair object is still undergoing activities post-confirmation, such as additional checks, billing preparation, or logistics handling (e.g.,preparing the object for return).
The SAP system uses this status to indicate ongoing work within the repair order, even after confirmation activities are recorded.
* Decision Pending: This status typically applies earlier, after a pre-check, when a decision (e.g., repair, reject) is still under review, not after confirmation.
* Accepted: This status may be set when the repair request is initially accepted, prior to confirmation.
* Confirmed: While "Confirmed" might intuitively seem correct due to the confirmation step, SAP documentation clarifies that this is not the displayed status post-REPC; it's a system status reflecting the confirmation action, but the user-facing status remains "In Process" until further steps (e.g., completion or closure) are finalized.
The Learning Journey emphasizes that "All In-House Repairs have the initial statusOpenafter they've been created in theManage In-House Repairsapp," and subsequent steps like confirmation shift the status to reflect ongoing processing rather than a terminal state like "Confirmed." This aligns with the process flow where confirmation is an intermediate step, not the end of the repair lifecycle.
Extract from SAP Documentation: "After confirming a repair object, the repair remains in process as additional steps such as billing or return logistics are completed." (SAP Learning Journey,Planning and Performing In-House Repairs, Lesson Content, 2023).
NEW QUESTION # 42
Which of the following can you assign to a work center? Note: There are 2 correct answers to this question.
Answer: A,C
Explanation:
Work centers in SAP S/4HANA Service (and Plant Maintenance) define execution locations and capacities:
* Task list usage: Specifies which task lists (e.g., service or maintenance) the work center can use, assigned in the work center master data (transaction CR01).
* Capacity category: Defines the type of capacity (e.g., labor, machine) available at the work center, critical for scheduling.
* Planner group: Assigned to technical objects or orders, not directly to work centers.
* Maintenance planning plant: A work center is assigned to a plant during creation, but the plant itself isn't assigned to the work center as a customizable attribute.These settings are configured in the work center master record."Assign task list usage and capacity categories to a work center to define its operational scope." (SAP Help Portal, Work Center Master Data).
NEW QUESTION # 43
......
If you are really not sure which version you like best, you can also apply for multiple trial versions of our C-TS470-2412 exam questions. We want our customers to make sensible decisions and stick to them. C-TS470-2412 study engine can be developed to today, and the principle of customer first is a very important factor. C-TS470-2412 Training Materials really hope to stand with you, learn together and grow together.
Authorized C-TS470-2412 Certification: https://www.test4engine.com/C-TS470-2412_exam-latest-braindumps.html
DOWNLOAD the newest Test4Engine C-TS470-2412 PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=1HSEdgdETawyAbTv2tEKuJFu09Fym7FCT
Campus : Level 1 190 Queen Street, Melbourne, Victoria 3000
Training Kitchen : 17-21 Buckhurst, South Melbourne, Victoria 3205
Email : info@russellcollege.edu.au
Phone : +61 399987554