BTW, DOWNLOAD part of Easy4Engine LEED-AP-Homes dumps from Cloud Storage: https://drive.google.com/open?id=1iywHtFee4xaT-grkREQd1lfIhkLyBj7f
Our company pays high attentions to the innovation of our LEED-AP-Homes study dump. We constantly increase the investment on the innovation and build an incentive system for the members of the research expert team. Our experts group specializes in the research and innovation of our LEED-AP-Homes exam practice guide and supplements the latest innovation and research results into the LEED-AP-Homes Quiz prep timely. Our experts group collects the latest academic and scientific research results and traces the newest industry progress in the update of the LEED-AP-Homes study materials.
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
>> USGBC LEED-AP-Homes Hottest Certification <<
Our LEED-AP-Homes study materials can improves your confidence for real LEED-AP-Homes exam and will help you remember the exam questions and answers that you will take part in. You can choose the version which suits you mostly. Our LEED-AP-Homes exam torrents simplify the important information and seize the focus to make you master the LEED-AP-Homes Test Torrent in a short time. To gain a comprehensive understanding of our LEED-AP-Homes study materials, you have to look at the introduction of our product firstly if you free download the demo of our LEED-AP-Homes exam questions.
NEW QUESTION # 58
Which of the following products will be eligible for points toward Materials and Resources Credit, Environmentally Preferable Products, Option 1: Local Production?
Answer: B
Explanation:
TheLEED for Homes Rating System (v4)awards points for theMaterials and Resources (MR) Credit:
Environmentally Preferable Products, Option 1: Local Production, which encourages the use of materials sourced locally to reduce transportation impacts.
According to theLEED Reference Guide for Homes Design and Construction (v4):
MR Credit: Environmentally Preferable Products, Option 1: Local Production (1-4 points) Use products that have been extracted, harvested, or recovered, as well as manufactured, within 100 miles (160 km) of the project site for at least 25%, 50%, or 90% (by cost) of the total materials.
Source: LEED Reference Guide for Homes Design and Construction, v4, Materials and Resources Credit:
Environmentally Preferable Products, p. 160.
TheLEED v4.1 Residential BD+Crating system confirms:
MR Credit: Environmentally Preferable Products, Option 1: Local Production Materials must be extracted, harvested, or recovered and manufactured within 100 miles (160 km) of the project site to qualify for local production points.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
Evaluation of options:
* A. Granite slabs extracted in China and manufactured and installed in New York City: Extracted in China, far exceeding the 100-mile (160 km) limit, so it does not qualify.
* B. Wood studs harvested and manufactured in Western Canada and installed in California within a 750 mi. (1,200 km) radius: The 750-mile radius exceeds the 100-mile limit, so it does not qualify.
* C. Wood studs harvested and manufactured in Mexico within a 98 mi. (158 km) radius of the final installation in New Mexico: Both harvesting and manufacturing are within 100 miles (160 km), meeting the local production criteria.
* D. Wooden doors manufactured in Oshkosh, Wisconsin, assembled 1,463 mi. (2,354 km) away in Provo, Utah, and installed 1,246 mi. (2,005 km) away in Austin, Texas: The distances for manufacturing and assembly far exceed the 100-mile limit, so it does not qualify.
The correct answer isOption C, as the wood studs meet the local production requirement of being harvested and manufactured within 100 miles (160 km) of the project site.
TheLEED AP Homes Candidate Handbookemphasizes MR credits, including Environmentally Preferable Products, and references theLEED Reference Guide for Homes Design and Constructionas a key resource.
The exam is based onLEED v4, ensuring the relevance of the 100-mile radius.
References:
LEED Reference Guide for Homes Design and Construction, v4, USGBC, Materials and Resources Credit: Environmentally Preferable Products, p. 160.
LEED v4.1 Residential BD+C, USGBC LEED Credit Library, accessed via LEED Online (https://www.
usgbc.org/credits).
LEED AP Homes Candidate Handbook, GBCI, October 2024, p. 12 (references study resources and exam scope based on LEED v4).
USGBC LEED for Homes Rating System (v4), available via USGBC website (https://www.usgbc.org
/resources/leed-homes-design-and-construction-v4).
LEED v4.1 for Homes, USGBC, accessed via LEED Online, confirming local production criteria.
NEW QUESTION # 59
To comply with Materials and Resources Prerequisite: Certified Tropical Wood, all wood in the building must be:
Answer: D
Explanation:
TheLEED for Homes Rating System (v4)includes theMaterials and Resources (MR) Prerequisite:
Certified Tropical Wood, which ensures that wood used in LEED projects is sourced sustainably to protect tropical ecosystems.
According to theLEED Reference Guide for Homes Design and Construction (v4):
MR Prerequisite: Certified Tropical Wood
All new wood in the project must be nontropical, reused, reclaimed, or certified by the Forest Stewardship Council (FSC). Tropical wood, if used, must be FSC-certified. This prerequisite ensures that wood sourcing does not contribute to deforestation in ecologically sensitive regions.
Source: LEED Reference Guide for Homes Design and Construction, v4, Materials and Resources Prerequisite: Certified Tropical Wood, p. 156.
TheLEED v4.1 Residential BD+Crating system confirms:
MR Prerequisite: Certified Tropical Wood
All wood must be nontropical, reused, reclaimed, or FSC-certified. Tropical wood is only permitted if it is FSC-certified.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
To comply, all wood must benon-tropical, reused, reclaimed, or certified(Option A), ensuring sustainable sourcing across all wood types used in the project.
Why not the other options?
Reference: LEED Reference Guide for Homes Design and Construction, v4, MR Prerequisite: Certified Tropical Wood, p. 156.
C). Only from the tropical region: This contradicts the prerequisite, as tropical wood must be FSC-certified, and non-tropical wood is preferred.Reference: LEED Reference Guide for Homes Design and Construction, v4, MR Prerequisite: Certified Tropical Wood, p. 156.
D). From within 200 miles of the building site: Local sourcing is relevant forMR Credit: Environmentally Preferable Products, Option 1, not this prerequisite.Reference: LEED Reference Guide for Homes Design and Construction, v4, MR Credit: Environmentally Preferable Products, p. 160.
TheLEED AP Homes Candidate Handbookemphasizes MR prerequisites, including Certified Tropical Wood, and references theLEED Reference Guide for Homes Design and Constructionas a key resource.
The exam is based onLEED v4, ensuring the relevance of the compliance criteria.
References:
LEED Reference Guide for Homes Design and Construction, v4, USGBC, Materials and Resources Prerequisite: Certified Tropical Wood, p. 156.
LEED v4.1 Residential BD+C, USGBC LEED Credit Library, accessed via LEED Online (https://www.
usgbc.org/credits).
LEED AP Homes Candidate Handbook, GBCI, October 2024, p. 12 (references study resources and exam scope based on LEED v4).
USGBC LEED for Homes Rating System (v4), available via USGBC website (https://www.usgbc.org
/resources/leed-homes-design-and-construction-v4).
LEED v4.1 for Homes, USGBC, accessed via LEED Online, confirming wood sourcing requirements.
NEW QUESTION # 60
How is credit earned under Regional Priority Credit, Regional Priority when the credit has multiple thresholds?
Answer: B
Explanation:
TheLEED for Homes Rating System (v4)includesRegional Priority (RP) Credits, which provide bonus points for achieving existing credits identified as environmentally significant for a project's region. For credits with multiple thresholds, exemplary performance can earn additional points.
According to theLEED Reference Guide for Homes Design and Construction (v4):
Regional Priority Credits (1-4 points)
Regional Priority Credits are awarded for achieving designated credits that address location-specific environmental priorities. For credits with multiple thresholds (e.g., Water Efficiency Credit: Outdoor Water Use), an additional bonus point is awarded when the maximum threshold has been exceeded, demonstrating exemplary performance.
Source: LEED Reference Guide for Homes Design and Construction, v4, Regional Priority Credits, p. 190; Innovation Credit: Innovation, p. 190.
TheLEED v4.1 Residential BD+Crating system confirms:
Regional Priority Credits
When an RP credit has multiple thresholds, a project earns the bonus point by meeting the base credit requirements, and an additional point may be earned for exemplary performance by exceeding the maximum threshold of the underlying credit.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The correct answer ispoints are awarded when the maximum threshold has been exceeded(Option C), as RP credits with multiple thresholds award bonus points for exemplary performance beyond the highest threshold.
Why not the other options?
* A. Points are awarded at the minimum threshold: RP credits require achieving the base credit, not just the minimum threshold.
* B. Points are awarded at the maximum threshold: Points are awarded for exceeding the maximum threshold, not just meeting it.
Reference: LEED Reference Guide for Homes Design and Construction, v4, Regional Priority Credits, p. 190.
TheLEED AP Homes Candidate Handbookemphasizes RP credits and exemplary performance, referencing theLEED Reference Guide for Homes Design and Constructionas a key resource. The exam is based on LEED v4, ensuring the relevance of exceeding thresholds.
References:
LEED Reference Guide for Homes Design and Construction, v4, USGBC, Regional Priority Credits, p.
190; Innovation Credit: Innovation, p. 190.
LEED v4.1 Residential BD+C, USGBC LEED Credit Library, accessed via LEED Online (https://www.
usgbc.org/credits).
LEED AP Homes Candidate Handbook, GBCI, October 2024, p. 12 (references study resources and exam scope based on LEED v4).
USGBC LEED for Homes Rating System (v4), available via USGBC website (https://www.usgbc.org
/resources/leed-homes-design-and-construction-v4).
LEED v4.1 for Homes, USGBC, accessed via LEED Online, confirming exemplary performance criteria.
NEW QUESTION # 61
The prerequisite for homeowner basic operations and training must include:
Answer: A
Explanation:
TheLEED for Homes Rating System (v4)includes theInnovation (IN) Prerequisite: Education of the Homeowner, Tenant, or Building Manager, which ensures occupants are educated on the home's sustainable features and maintenance requirements.
According to theLEED Reference Guide for Homes Design and Construction (v4):
IN Prerequisite: Education of the Homeowner, Tenant, or Building Manager Provide a minimum of a two-hour walk-through of the home with the homeowner or tenant, including training on the operation and maintenance of equipment and systems, such as HVAC, water heating, and renewable energy systems.
Source: LEED Reference Guide for Homes Design and Construction, v4, Innovation Prerequisite: Education of the Homeowner, Tenant, or Building Manager, p. 188.
TheLEED v4.1 Residential BD+Crating system confirms:
IN Prerequisite: Education of the Homeowner or Tenant
A two-hour walk-through with equipment training is required to educate homeowners on the operation and maintenance of green features.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The prerequisite requiresa two-hour house walk-through including equipment training(Option C) to ensure homeowners understand how to operate and maintain the home's sustainable systems.
Why not the other options?
Reference: LEED Reference Guide for Homes Design and Construction, v4, IN Credit: Innovation, p. 190.
B). A map of neighborhood open spaces: This is relevant toLT Credit: Community Resources and Services, not homeowner education.Reference: LEED Reference Guide for Homes Design and Construction, v4, LT Credit: Community Resources and Services, p. 56.
D). A DVD with operations and maintenance information: While supplementary materials like DVDs are allowed, the prerequisite mandates a walk-through, not a DVD.Reference: LEED Reference Guide for Homes Design and Construction, v4, IN Prerequisite: Education of the Homeowner, Tenant, or Building Manager, p.
188.
TheLEED AP Homes Candidate Handbookemphasizes IN prerequisites, including homeowner education, and references theLEED Reference Guide for Homes Design and Constructionas a key resource. The exam is based onLEED v4, ensuring the relevance of the walk-through requirement.
References:
LEED Reference Guide for Homes Design and Construction, v4, USGBC, Innovation Prerequisite:
Education of the Homeowner, Tenant, or Building Manager, p. 188.
LEED v4.1 Residential BD+C, USGBC LEED Credit Library, accessed via LEED Online (https://www.
usgbc.org/credits).
LEED AP Homes Candidate Handbook, GBCI, October 2024, p. 12 (references study resources and exam scope based on LEED v4).
USGBC LEED for Homes Rating System (v4), available via USGBC website (https://www.usgbc.org
/resources/leed-homes-design-and-construction-v4).
LEED v4.1 for Homes, USGBC, accessed via LEED Online, confirming homeowner education requirements.
NEW QUESTION # 62
The project team is planning trades training to meet requirements for the Integrative Process Credit, Option 2:
Trades Training. How many hours are required to earn this credit?
Answer: C
Explanation:
TheLEED for Homes Rating System (v4)includes theIntegrative Process (IP) Credit: Integrative Process, Option 2: Trades Training, which requires training for construction trades to ensure proper implementation of green building strategies.
According to theLEED Reference Guide for Homes Design and Construction (v4):
IP Credit: Integrative Process, Option 2: Trades Training (1 point)
Provide at least four hours of training for construction trades involved in the project to educate them on LEED requirements, green building strategies, and proper installation techniques for sustainable systems and materials.
Source: LEED Reference Guide for Homes Design and Construction, v4, Integrative Process Credit:
Integrative Process, p. 45.
TheLEED v4.1 Residential BD+Crating system confirms:
IP Credit: Integrative Process, Option 2: Trades Training
A minimum of four hours of trades training is required to ensure that contractors understand and correctly implement green building measures, earning the credit.
Source: LEED v4.1 Residential BD+C, Credit Library, accessed via USGBC LEED Online.
The correct answer isfour hours(Option A), as this is the minimum duration required for trades training to earn the credit.
Why not the other options?
* B. Six hours: This exceeds the minimum requirement of four hours.
* C. Eight hours: This is unnecessarily long for the credit's requirement.
Reference: LEED Reference Guide for Homes Design and Construction, v4, IP Credit: Integrative Process, p.
45.
TheLEED AP Homes Candidate Handbookemphasizes IP credits, including trades training, and references theLEED Reference Guide for Homes Design and Constructionas a key resource. The exam is based on LEED v4, ensuring the relevance of the four-hour requirement.
References:
LEED Reference Guide for Homes Design and Construction, v4, USGBC, Integrative Process Credit:
Integrative Process, p. 45.
LEED v4.1 Residential BD+C, USGBC LEED Credit Library, accessed via LEED Online (https://www.
usgbc.org/credits).
LEED AP Homes Candidate Handbook, GBCI, October 2024, p. 12 (references study resources and exam scope based on LEED v4).
USGBC LEED for Homes Rating System (v4), available via USGBC website (https://www.usgbc.org
/resources/leed-homes-design-and-construction-v4).
LEED v4.1 for Homes, USGBC, accessed via LEED Online, confirming trades training duration.
NEW QUESTION # 63
......
Different from traditional learning methods, our LEED-AP-Homes exam products adopt the latest technology to improve your learning experience. We hope that all candidates can try our free demo before deciding to buy our LEED-AP-Homes study guide. The Q&A contained in the free demo are also compiled by our vetaren professionals who keep close on the changes of the LEED-AP-Homes learning dumps according to the real exam. Come and have a try, you will get satisfied with our LEED-AP-Homes training engine!
LEED-AP-Homes Test Score Report: https://www.easy4engine.com/LEED-AP-Homes-test-engine.html
DOWNLOAD the newest Easy4Engine LEED-AP-Homes PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=1iywHtFee4xaT-grkREQd1lfIhkLyBj7f
Campus : Level 1 190 Queen Street, Melbourne, Victoria 3000
Training Kitchen : 17-21 Buckhurst, South Melbourne, Victoria 3205
Email : info@russellcollege.edu.au
Phone : +61 399987554